Electricity load level detail in computational general equilibrium – Part I – Data and calibration

A-Tier
Journal: Energy Economics
Year: 2014
Volume: 46
Issue: C
Pages: 258-266

Authors (2)

Score contribution per author:

2.011 = (α=2.01 / 2 authors) × 2.0x A-tier

α: calibrated so average coauthorship-adjusted count equals average raw count

Abstract

The growing importance of the electricity sector in many economies, and of energy and environmental policies, requires a detailed consideration of these sectors and policies in computable general equilibrium (CGE) models, including both technological and temporal aspects. This paper presents the first attempt to our knowledge at building temporal disaggregation into a CGE model, while keeping technological detail. This contribution is coupled with some methodological improvements over existing technology-rich CGE models. The model is able to account for the indirect effects characteristic of CGE models while also mimicking the detailed behavior of the electricity operation and investment present before only in bottom-up detailed models. The present paper is the first of two parts and focuses on the bottom-up top-down calibration methodology needed to build such a model. Part II will present the CGE model applied to the evaluation of an energy policy with temporal consequences.

Technical Details

RePEc Handle
repec:eee:eneeco:v:46:y:2014:i:c:p:258-266
Journal Field
Energy
Author Count
2
Added to Database
2026-01-25