Why is Brazil enriching uranium?

B-Tier
Journal: Energy Policy
Year: 2008
Volume: 36
Issue: 7
Pages: 2570-2577

Authors (2)

Cabrera-Palmer, Belkis (not in RePEc) Rothwell, Geoffrey (Stanford University)

Score contribution per author:

1.005 = (α=2.01 / 2 authors) × 1.0x B-tier

α: calibrated so average coauthorship-adjusted count equals average raw count

Abstract

In Brazil construction began in 1971 on Angra 1, a 626 MW Westinghouse pressurized water reactor (PWR). It was completed in 1984. Later, Angra 2 (a Kraftwerk Union PWR) achieved commercial operation in 2000. Brazil is considering the construction of seven nuclear power plants over the next 15 years. In preparation for this nuclear industry expansion, Brazil is building a uranium enrichment facility to provide nuclear fuel for Angra 1 and 2 starting in 2010 at Resende in the state of Rio de Janeiro, and collated with nuclear fuel fabrication facilities. This paper investigates whether the Resende Enrichment Facility will be able to provide uranium enrichment services at a cost lower than the international market price. We find that while Brazil is unlikely to be internationally competitive in the enrichment market, the Resende Enrichment Facility completes the front end of Brazil's nuclear fuel cycle. This assures uninterrupted nuclear fuel to its currently operating light water reactors, while providing the option of expanding capacity, lowering cost, and competing in the international nuclear fuel market after 2020.

Technical Details

RePEc Handle
repec:eee:enepol:v:36:y:2008:i:7:p:2570-2577
Journal Field
Energy
Author Count
2
Added to Database
2026-01-29