Optimal Procurement Contracts with Pre-Project Planning

S-Tier
Journal: Review of Economic Studies
Year: 2011
Volume: 78
Issue: 3
Pages: 1015-1041

Authors (2)

Score contribution per author:

4.022 = (α=2.01 / 2 authors) × 4.0x S-tier

α: calibrated so average coauthorship-adjusted count equals average raw count

Abstract

The paper studies procurement contracts with pre-project investigations in the presence of adverse selection and moral hazard. To model the procurer's problem, we extend a standard sequential screening model to endogenous information acquisition with moral hazard. The optimal contract displays systematic distortions in information acquisition. Due to a rent effect, adverse selection induces too much information acquisition to prevent cost overruns and too little information acquisition to prevent false project cancellations. Moral hazard mitigates the distortions related to cost overruns yet exacerbates those related to false negatives. The optimal mechanism is a menu of option contracts that achieves the dual goal of providing incentives for information acquisition and truthful information revelation. Copyright 2011, Oxford University Press.

Technical Details

RePEc Handle
repec:oup:restud:v:78:y:2011:i:3:p:1015-1041
Journal Field
General
Author Count
2
Added to Database
2026-01-29